PERT estimator

PERT gives a weighted expected duration and a rough sigma from O/M/P.

Enter O ≤ M ≤ P to get TE and confidence intervals.

PERT estimator

Inputs

Results

Expected time (TE) —
σ —
~68% CI low —
~68% CI high —
~95% CI low —
~95% CI high —

Chart

Three-point engineering estimates

What

PERT gives a weighted expected duration and a rough sigma from O/M/P.

Why

Single-point estimates are usually optimistic.

How

Enter O ≤ M ≤ P to get TE and confidence intervals.

Formula: TE = (O + 4M + P) ÷ 6 · σ = (P − O) ÷ 6

Why you’ll love this

Single-point estimates are usually optimistic — use three points.

How to jump in

  1. O / M / P

    Keep O ≤ M ≤ P.

  2. TE and σ

    Expected time and spread.

  3. Confidence bands

    Rough 68% and 95% ranges.

What you walk away with

  • Classic PERT formula
  • CI bands
  • Bar chart
  • Free

Where it shines

Task estimates

Replace one hopeful number.

Schedule risk

See the O-to-P gap.

With timeline

Feed TE into project plans.

Quick answers

What unit?

Any consistent unit (hours/days).

Exact statistics?

A common engineering approximation, not a formal hypothesis test.